1. Site foundation pretreatment
Before construction, it is necessary to thoroughly remove foreign objects such as gravel and weeds in the site, and use a roller to roll the foundation in layers, and the density must reach more than 95%. The edge area should be chamfered at 45 degrees to prevent the subsequent materials from warping.
2. Elastic layer structure construction
Use polyurethane adhesive as the base material and lay it evenly through a scraping device. Rubber particles need to be spread according to particle size, and infrared heating equipment is used to fully integrate the particles and adhesive to form an elastic layer with buffering performance.
3. Functional surface treatment
Choose polyurethane or acrylic coating materials according to the use requirements, and the ambient temperature during construction should be kept within the range of 10-35℃. Use a cross-brush process to ensure that the coating thickness is uniform and has good anti-slip and wear-resistant properties.
4. Finished product quality verification
The elastic index is tested by a Shore hardness tester, and the anti-slip performance is evaluated by a friction coefficient tester. Chemical testing must comply with GB/T 14833 standards, with a focus on monitoring heavy metal content and volatile organic compound indicators. The runway marking accuracy error must not exceed 3mm.
The complete production process involves multidisciplinary knowledge such as materials science and mechanical engineering, and each link directly affects the performance and durability of the runway. The professional construction team should be equipped with complete testing equipment to ensure that the results of each stage meet the design requirements.